Pascal and Francis Bibliographic Databases

Help

Search results

Your search

kw.\*:("Flow shop")

Document Type [dt]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Publication Year[py]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Discipline (document) [di]

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Language

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Author Country

A-Z Z-A Frequency ↓ Frequency ↑
Export in CSV

Results 1 to 25 of 623

  • Page / 25
Export

Selection :

  • and

Modélisation unifiée de Flowshops à deux machines = Unified modelling of flowshops with two machinesLENTE, Christophe; BILLAUT, Jean-Charles; BOUQUARD, Jean-Louis et al.MOSIM '01 : conference francophone de modélisation et simulation. 2001, isbn 1-56555-212-1, 3Vol, V2, 599-603Conference Paper

Uet flow shop scheduling with delaysRAYWARD-SMITH, V. J; REBAINE, D.Informatique théorique et applications (Imprimé). 1996, Vol 30, Num 1, pp 23-30, issn 0988-3754Article

Flowshop scheduling with dominant machinesHO, J. C; GUPTA, J. N. D.Computers & operations research. 1995, Vol 22, Num 2, pp 237-246, issn 0305-0548Article

A strongly polynomial algorithm for no-wait cyclic robotic flowshop schedulingKATS, V; LEVNER, E.Operations research letters. 1997, Vol 21, Num 4, pp 171-179, issn 0167-6377Article

A method and a diagnosis system to value the production performances of manufacturing flow-line systemsCAUFFRIEZ, L; WILLAEYS, D; DEFRENNE, J et al.CESA'96 IMACS Multiconference : computational engineering in systems applications. 1996, pp 814-819, isbn 2-9502908-9-2, 2VolConference Paper

A polynomial approximation scheme for a constrained flow-shop scheduling problemHALL, L. A.Mathematics of operations research. 1994, Vol 19, Num 1, pp 68-85, issn 0364-765XArticle

Heuristics for scheduling flexible flow linesFONG-YUEN DING; DUANGJAI KITTICHARTPHAYAK.Computers & industrial engineering. 1994, Vol 26, Num 1, pp 27-34, issn 0360-8352Article

Permutation flow shop scheduling with dominant machines to minimize discounted total weighted completion timeWANG, Ji-Bo; FENG SHAN; BO JIANG et al.Applied mathematics and computation. 2006, Vol 182, Num 1, pp 947-954, issn 0096-3003, 8 p.Article

Lot streaming of a single product in two-machine no-wait flowshopsSRISKANDARAJAH, C; WAGNEUR, E.INRIA / IEEE symposium on emerging technologies and factories automation. 1995, pp 427-436, isbn 0-7803-2535-4, 3VolConference Paper

Stochastically minimizing the makespan in two-machine flow shops without blockingKAMBUROWSKI, J.European journal of operational research. 1999, Vol 112, Num 2, pp 304-309, issn 0377-2217Article

Flow-shop robotisé monoproduit avec stockage = Single product robotic flow-shop with buffersBRAUNER, N; FINKE, G; GUEGUEN, C et al.Journal européen des systèmes automatisés. 1998, Vol 32, Num 7-8, pp 875-891, issn 1269-6935Article

A polynomial approximation scheme for problem F2/rj/CmaxKOVALYOV, M. Y; WERNER, F.Operations research letters. 1997, Vol 20, Num 2, pp 75-79, issn 0167-6377Article

An evaluation of sequencing heuristics in flow shops with multiple processorsSANTOS, D. L; HUNSUCKER, J. L; DEAL, D. E et al.Computers & industrial engineering. 1996, Vol 30, Num 4, pp 681-691, issn 0360-8352Article

Genetic algorithms for flowshop scheduling problems : Genetic algorithms and industrial engineeringMURATA, T; ISHIBUCHI, H; TANAKA, H et al.Computers & industrial engineering. 1996, Vol 30, Num 4, pp 1061-1071, issn 0360-8352Article

Lot sizing in a no-wait flow shopEMMONS, H; KAMLESH MATHUR.Operations research letters. 1995, Vol 17, Num 4, pp 159-164, issn 0167-6377Article

A note on scheduling alternative operations in two-machine flow shopsCHENG, T. C. E; WANG, G.The Journal of the Operational Research Society. 1998, Vol 49, Num 6, pp 670-673, issn 0160-5682Article

Approximability of flow shop scheduling : Sequencing and schedulingHALL, L. A.Mathematical programming. 1998, Vol 82, Num 1-2, pp 175-190, issn 0025-5610Article

On the complexity of two-machine flowshop problems with due date related objectivesKOULAMAS, C.European journal of operational research. 1998, Vol 106, Num 1, pp 95-100, issn 0377-2217Article

Optimal four-stage production schedules, an extension of Johnson's ruleCHEN, W.-N.International journal of information and management sciences. 1997, Vol 8, Num 4, pp 23-27, issn 1017-1819Article

Multi-objective genetic algorithm and its applications to flowshop scheduling : Genetic algorithms and industrial engineeringMURATA, T; ISHIBUCHI, H; TANAKA, H et al.Computers & industrial engineering. 1996, Vol 30, Num 4, pp 957-968, issn 0360-8352Article

Heuristic algorithms for scheduling in the n-wait flowshopRAJESH GANGADHARAN; CHANDRASEKHARAN RAJENDRAN.International journal of production economics. 1993, Vol 32, Num 3, pp 285-290, issn 0925-5273Article

Multi-objective flow-shop : Preliminary resultsBRIZUELA, C; SANNOMIYA, N; ZHAO, Y et al.Lecture notes in computer science. 2001, pp 443-457, issn 0302-9743, isbn 3-540-41745-1Conference Paper

A two-stage hybrid flowshop with uniform machines and setup timesHUANG, W; LI, S.Mathematical and computer modelling. 1998, Vol 27, Num 2, pp 27-45, issn 0895-7177Article

New separation scheme for hybrid flowshopDUPONT, L; VIGNIER, A; PORTMANN, M.-C et al.Journal européen des systèmes automatisés. 1998, Vol 32, Num 4, pp 453-465, issn 1269-6935Article

A trade-off between data quality and updating costs in scheduling databasesBONJOUR, E; BAPTISTE, P.Journal européen des systèmes automatisés. 1998, Vol 32, Num 4, pp 467-486, issn 1269-6935Article

  • Page / 25